1 X 124MW GE Frame 9E Complete CHP Power Plant
Gas Turbine Model / Type General Electric -GE Frame 9E – PG9171(E)
Design Output 124 MW
Design Heat Rate Net Heat Rate at generator Terminals kJ/KWh 10 716 ±1%
DLN System DLN1
Commissioning Date 2009 S
hut-Down Date November 2017
Total Fired Time 56500
Planned Maintenance Date 2012 Hot gas path Inspection, 2015 Major Inspection
Rated Output / Terminal Voltage 150 MVA – 15 kV
Transformers Step up Transformer :153 MVA Transformer: 10 MVA – 15kV/ 6,3 kV _ 2 MVA 6,3kV/0,4 kV