1 X 124MW GE Frame 9E Complete CHP Power Plant

Gas Turbine Model / Type General Electric -GE Frame 9E – PG9171(E)
Design Output 124 MW
Design Heat Rate Net Heat Rate at generator Terminals kJ/KWh 10 716 ±1%
DLN System DLN1
Commissioning Date 2009 S
hut-Down Date November 2017
Total Fired Time 56500
Planned Maintenance Date 2012 Hot gas path Inspection, 2015 Major Inspection
Rated Output / Terminal Voltage 150 MVA – 15 kV
Transformers Step up Transformer :153 MVA Transformer: 10 MVA – 15kV/ 6,3 kV _ 2 MVA 6,3kV/0,4 kV

SKU: 50972 Categories: , ,

Make an Enquiry

  • Drop files here or
    Accepted file types: jpg, png, pdf, Max. file size: 8 MB.
      We will require the following documents: 1: Site planning permission 2: Photo ID 3: Licence agreement